MENU

LAS VEGAS EXASCALE DATA CENTER
ECOSYSTEMS AT UNPARALLELED LOW PRICING

The Core Campus located in Las Vegas, Nevada, will have up to 531 MW of power upon completion. Switch’s Tier 5® Platinum exascale data center facilities make Switch the highest-rated and most cost-effective colocation environment in the industry.

100% GREEN POWER

  • 100% green power
  • 100% power uptime guarantee
  • Up to 55kW per cabinet

LOW OR NO TAXES

  • 2% sales and use tax in Nevada
  • 75% reduction in personal property tax in Nevada
  • No personal state income tax in Nevada

35-60% SAVINGS ON CONNECTIVITY

  • 5ms to Los Angeles
  • Dedicated 7ms fiber to Switch’s Citadel Campus via the Switch SUPERLOOP®
  • Services include: MPLS, IP, Transport, SIP and SD-WAN (Circuits do not have to terminate at Switch)
  • 35-60% on connectivity savings through Switch CONNECT® telecom auditing and expense management services
  • Exascale telecom purchasing is enabled by leveraging the multi-trillion dollar market cap of co-op members through The CORE Cooperative
LAS VEGAS, NEVADA
The Core Campus
Sq. Ft. MW Status
LAS VEGAS 1-6 88,383 Sq. Ft. Up to 15
LAS VEGAS 7 638,807 Sq. Ft. Up to 100
LAS VEGAS 8 436,451 Sq. Ft. Up to 50
LAS VEGAS 9 479,136 Sq. Ft. Up to 50
LAS VEGAS 10 357,556 Sq. Ft. Up to 40
LAS VEGAS 11 381,881 Sq. Ft. Up to 40
LAS VEGAS 12 60,352 Sq. Ft. Up to 20
LAS VEGAS 14
LAS VEGAS 15
LAS VEGAS 16
TOTALS 2,442,566 Sq. Ft. Up to 315 MW Open Construction Planned

CONTACT A TECHNOLOGY INFRASTRUCTURE EXPERT CONTACT US

Switch

The World’s Leading Data Center Ecosystem Switch
Las Vegas Nevada 89118